Re: Best way to handle poor electric delivery
To: CRTech <crtech@crtech.org>
Subject: Re: Best way to handle poor electric delivery
From: Tom Van Gorkom <tomvangorkom@gmail.com>
Date: Wed, 5 Apr 2017 14:59:25 -0500
Dkim-signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=mime-version:in-reply-to:references:from:date:message-id:subject:to; bh=bDnUlqWL/r/62kl2+FqoIjIby7RJIfnAwQtQqDRCan0=; b=t9fKFBOPqE3CkaLtbj3jUlQ+HxQg6qrEn3PMjzAb8G2cJVzrTBi7BKkyOBKlCIZBYf IPCbIQMcQHG4Fj1HJYwLNOl8xrhRVsyaHqzNCXa4uq0DNlAnzooHC82q0t/JsZd1xjye JBqy51BsIUbhYLWUBQ7BSNmtOTxA8BZnCer1BS22/Ik2FpJ9JiNKnnVQfQuzRR7gQlMN REGjM2jz94obzXp8ZC3vkH8fyrAlh7aqyrzrdIovZ298ffyYZHVaslo6KmtOfJ9Voq8E IhjVrab/YOreKUY3fOpY22yQjuhUr2uoPOimtdjgz3s2wRWEflNkVAlegZQNTsOfUXC8 FEqw==
In-reply-to: <58e5463c.4c0c6b0a.639a3.0b2e@mx.google.com>
References: <MWHPR20MB16464E2CDEF632DC208F35E9B40A0@MWHPR20MB1646.namprd20.prod.outlook.com> <CAB42DVqnnChU0cG+C8SqyfUNy1nZpJSP1E5e3=TLtmtyW+c6JQ@mail.gmail.com> <cd27567f-652b-465c-7642-b841b604cfbc@knlr.com> <MWHPR20MB164679149A474DC6D71F9281B40A0@MWHPR20MB1646.namprd20.prod.outlook.com> <CAB42DVr=nNZk5Yccg-eeY9kZbKh1CP+LiumY94wh6TwYiuxPnw@mail.gmail.com> <58e5463c.4c0c6b0a.639a3.0b2e@mx.google.com>
OK, you are correct. It's how they connect the neutral on one side (transformer) that causes two legs to give 120 and the point of the other two to be high so maybe it's a closed delta with the three transformers unless something has failed on the pole. We went with a Wye transformer and changed the taps on the transmitter transformer for 208 along with re-connecting the windings of the generator for the same. It's been trouble free for 2 years now after years of constant troubles and expense with the old power.

Tom Van Gorkom
Radio Esperanza Engineering, KRIO AM/FM, KOIR FM
Office: 956-380-8150  
Cell: 865-803-7427

Rio Grande Bible Institute
4300 S US Hwy 281
Edinburg, TX 78539

On Wed, Apr 5, 2017 at 2:31 PM, Alan Kilgore <wrvm.engineer@gmail.com> wrote:
Wye service has 208 Line-to-Line Voltage and 120VAC line-to-neutral, which is close to what you described, Tom.

Closed delta service has 240VAC line-to-line and 120VAC for two lines to neutral and 208VAC for the third line-to-neutral, which is a good choice and is within tolerance for what Soloman described. The Voltages are on the high side so he may be near a substation.
____________________________________
Alan Kilgore, CPBE
WRVM Chief Engineer

At 02:18 PM 4/5/2017, you wrote:
Even though there are 3 transformers on the pole, the voltages represent an open delta configuration - not good for a transmitter site. All 3 lines to ground should be 120 and 208-240 L-L depending on the configuration.

Tom Van Gorkom
Radio Esperanza Engineering, KRIO AM/FM, KOIR FM
Office: 956-380-8150 Â
Cell: 865-803-7427

Rio Grande Bible Institute
4300 S US Hwy 281
Edinburg, TX 78539

On Wed, Apr 5, 2017 at 2:09 PM, Solomon Bachman <sbachman@kcbi.org> wrote:

@ Terry & Tom - There are three transformers on the pole, Line voltages are A-G 123 B-G 212 C-G 122 and L-L 240.

<snip>

Solomon N Bachman | Chief Engineer


---------------------------------------------------------------------
For CRTech resources visit http://CRTech.org/
To unsubscribe, e-mail: crtech-unsubscribe@crtech.org
List problems?  E-mail: TechStaff@CRTech.org


References: Best way to handle poor electric delivery
(Solomon Bachman <sbachman@kcbi.org>, 5 Apr 2017 15:24:55 -0000)
Re: Best way to handle poor electric delivery
(Tom Van Gorkom <tomvangorkom@gmail.com>, 5 Apr 2017 15:39:43 -0000)
Re: Best way to handle poor electric delivery
(Terry Cowan <tcowan@knlr.com>, 5 Apr 2017 16:37:09 -0000)
RE: Best way to handle poor electric delivery
(Solomon Bachman <sbachman@kcbi.org>, 5 Apr 2017 19:09:27 -0000)
Re: Best way to handle poor electric delivery
(Tom Van Gorkom <tomvangorkom@gmail.com>, 5 Apr 2017 19:18:51 -0000)
Re: Best way to handle poor electric delivery
(Alan Kilgore <wrvm.engineer@gmail.com>, 5 Apr 2017 19:32:22 -0000)
Prev by date: Re: Best way to handle poor electric delivery
(Alan Kilgore, 5 Apr 2017 19:32:22 -0000)
Next by date: RE: Best way to handle poor electric delivery
(Don Parker, 5 Apr 2017 20:21:22 -0000)
Prev by thread: Re: Best way to handle poor electric delivery
(Alan Kilgore, 5 Apr 2017 19:32:22 -0000)
Next by thread: RE: Best way to handle poor electric delivery
(Don Parker, 5 Apr 2017 20:21:22 -0000)
CRTech.org